Jávea Pools WhatsApp

How a pool build runs on site

A concrete pool is built in a fixed order: excavation, steel, gunite shell, plumbing and electrics, finish, coping and terrace, then filling and water start-up. On a typical plot the site work takes eight to fourteen weeks, most of it waiting for concrete to cure.

Tiled pool steps leading down into clear blue water

Excavation

We mark out the pool, protect the existing garden and bring in the excavator. Soil is taken away or kept for landscaping; rock is broken out with a hydraulic breaker. On sloping plots this is also when retaining walls and foundations go in.

Questions about your own pool? Ask us on WhatsApp.

Ask on WhatsApp

Steel and gunite

A cage of reinforcing steel is tied in the hole, with the pipes for skimmers, returns, lights and the main drain fixed in place. Then the gunite crew sprays the concrete shell in one day, so it has no cold joints. The shell then cures for several weeks while we work on the plant room.

Plumbing, electrics and the plant room

Pipework runs to the plant room, where we fit the filter, pump, chlorinator and any heat pump. The electrician connects the panel, lights and timers. Everything is pressure-tested before it is buried.

Finish, coping and terrace

The shell is rendered and waterproofed, then finished in mosaic, porcelain or membrane. The coping stones go on, followed by the terrace around the pool. This is the stage that makes the pool look the way you imagined it.

Filling and start-up

We fill the pool, balance the water, start the equipment and run it for the first weeks until the water and the new render have settled. You get a handover with the settings and the first month of maintenance visits.

If you are not here

Many of our build clients are abroad for most of the job. We send photos and a short update every week, and arrange video calls at the key moments, such as setting out the pool and choosing the finish on site.

The service behind this page

This is part of our new pool construction work. Pools designed and built from bare ground, licence included.

Questions we are asked

Why does the shell have to cure for so long?

Concrete gains strength over several weeks. Rendering or tiling too soon risks cracks and tiles lifting later, so we never rush this step.

Will the build damage my garden?

There is always some disturbance. We agree an access route, protect what can be protected and reinstate the garden around the new terrace at the end.

Planning a pool project?

Message us on WhatsApp and we will arrange a visit, or answer your question straight away if we can.

WhatsApp us
WhatsApp us for a quote