New pool construction
A new concrete pool in this part of the Costa Blanca typically takes eight to fourteen weeks from survey to first swim, depending on the licence, the rock and the finish. An 8 x 4 m pool with standard finishes usually costs €22,000–€32,000; premium porcelain or larger pools run higher.

What we build
Almost every pool we build is a reinforced concrete shell, sprayed as gunite onto a steel cage and finished in mosaic, porcelain or a reinforced membrane. It is the most durable way to build on the rocky, sloping plots of the Marina Alta, and it lets us shape the pool to the plot rather than the other way round.
- Classic rectangular pools with a Roman or corner staircase, the standard for family villas.
- Lap pools along a terrace or boundary, where plots are long and narrow.
- Infinity and overflow pools on sea-view plots (see infinity pools).
- Plunge pools for small gardens and townhouse patios, often heated.
- Beach entries and sun ledges for shallow lounging and children.
Send a photo of your pool or plot and we will tell you the next step for a new pool.
Ask on WhatsAppFrom survey to first swim
We start with a visit to the plot. We check access for the excavator, where the rock starts, the slope, the drainage and where the plant room can sit without spoiling the view. You get a drawing and a fixed quote that lists the shell, finish, coping, equipment and any retaining walls separately, so you can see where the money goes.
Once you approve the design, we prepare the licence paperwork for the town hall (see how the licence works). Excavation follows, then the steel and the gunite shell, the plumbing and electrics, the finish, coping and terrace, and finally the fill and the start-up of the water. We keep owners who live abroad updated with photos at every stage.
Choosing the finish and equipment
The finish sets both the look and the long-term upkeep. Mosaic (gresite) is the traditional choice and easy to repair. Large-format porcelain gives a sleek, modern look and costs more. A reinforced membrane is the quickest and most watertight option. We compare them on choosing a pool finish.
For equipment we fit a sand or glass filter, a variable-speed pump to keep running costs down, and either a salt chlorinator or automatic dosing. Many owners add a heat pump and a cover at build stage, when the plumbing and power are easiest to run.
Where we fit
We suit owners who want one team to handle the whole job: design, licence, build and the first season of care. If you only need the shell dug and sprayed for your own builder to finish, we can quote for that too.
Where we do this
We work across the north of the Costa Blanca:
Related services
Questions we are asked
How long does it take to build a pool here?
Allow eight to fourteen weeks on site once the licence is granted. Rock, sloping plots and porcelain finishes add time; a simple membrane-lined pool on a flat plot is quickest.
Can a pool be built in winter?
Yes. Winter is the best time to build, because crews are free and the pool is ready to swim in by late spring. We plan most builds to finish by Easter.
What happens if you hit rock when digging?
Rock is normal in Jávea and the surrounding hills. We check where it starts at the survey, price breaking it out as a separate line, and use a hydraulic breaker where needed.