Jávea Pools WhatsApp

The pool licence: how we handle the permit

Building a new pool needs permission from the town hall before any digging starts. We prepare the drawings and application for you, and the time it takes depends on the council, the plot and whether the land is urban or rural.

Modern white villa with a rectangular swimming pool and terrace

What the council looks at

Every town hall in the Marina Alta, including the Ajuntament de Xàbia, checks a new pool against its local planning rules. The main points are the distance from the boundaries, the total built area on the plot, how the pool sits on a slope, and, on rural land, whether a pool is allowed at all. Larger structural jobs such as infinity pools on retaining walls need a technical project signed by an architect or engineer.

Questions about your own pool? Ask us on WhatsApp.

Ask on WhatsApp

What we prepare

Once you have approved the design, we draw the pool on a site plan, specify the structure and equipment, and prepare the application with the fees and supporting documents the council asks for. If a technical project is needed, we commission it from the architects and engineers we work with. You sign; we submit and follow it up.

How long it takes

Timings vary from one council to another and from one season to the next. Simple pools on urban plots can move quickly; rural plots and structural pools take longer. We give you a realistic timescale at the quote stage and plan the build around it, so a winter build still finishes in time for summer. See new pool construction for the full process.

Buying a villa with an unlicensed pool

Some older villas have pools that were never properly licensed. It is worth checking before you buy, and we can look at the pool's condition at the same time. See buying a villa with a pool.

The service behind this page

This is part of our new pool construction work. Pools designed and built from bare ground, licence included.

Questions we are asked

Can work start before the licence arrives?

No. We only start digging once the permission is granted, so you are never left with a half-built pool and a fine.

Does a renovation need a licence?

Relining or re-tiling an existing pool usually needs only a simple notice to the council, not a full licence. We check the requirement with the town hall for each job.

Planning a pool project?

Message us on WhatsApp and we will arrange a visit, or answer your question straight away if we can.

WhatsApp us
WhatsApp us for a quote